NO. | PROJECT NAME | DESCRIPTION | QTY | YEAR |
| | | | |
1 | Mall Balikpapan Kalimantan | Instalasi Genset 1000 kVA | 2 units | 2006 |
| | | | |
2 | Carrefour Duta Merlin Jakarta | Instalasi Genset 1250 kVA | 1 unit | 2006 |
| | | | |
3 | Matahari Malang Town Square | Instalasi Genset 840 kVA | 2 units | 2006 |
| | | | |
4 | Pharmasi Binangkit / Pabrik Pacecap | Instalasi Genset 350 kVA | 1 unit | 2006 |
| Majalengka | | | |
| | | | |
5 | RS. Meilia Cibubur | Instalasi Silent Bonnet 1000 kVA | 2 units | 2006 |
| | | | |
6 | FO. Heritage Bandung | Instalasi Genset 720 kVA | 1 unit | 2007 |
| | | | |
7 | Apartement Casablanca Mansion | Instalasi Genset 500 kVA | 1 unit | 2007 |
| | Instalasi Genset 720 kVA | 1 unit | |
| | | | |
8 | Matahari Cibubur Town Square | Instalasi Genset 840 kVA | 2 units | 2007 |
| | | | |
9 | Mall Panakkukang Makasar | Instalasi Genset 2000 kVA | 3 units | 2007 |
| | | | |
10 | RS. Sentosa Internasional (RSSI) | Instalasi Genset 2000 kVA | 2 units | 2007 |
| Bandung | | | |
| | | | |
11 | BG Junction Surabaya | Instalasi Genset 2000 kVA | 5 units | 2008 |
| | | | |
12 | Matahari Depok Town Square | Instalasi Genset 840 kVA | 2 units | 2008 |
| | | | |
13 | Matahari Grand Palladium Medan | Instalasi Genset 840 kVA | 2 units | 2008 |
| | | | |
14 | Depok Town Center | Instalasi Genset 500 kVA | 2 units | 2008 |
| | | | |
15 | The Grove Apartment & Wall | Instalasi Genset 2000 kVA Mitsubishi | 5 units | 2008 |
| | | | |
16 | Bakrie Tower | Instalasi Genset 2000 kVA Mitsubishi | 5 units | 2008 |
| | | | |
17 | Grand City Surabaya | Instalasi Genset 2000 kVA Cummins | 5 units | 2008 |
| | | | |
18 | Mepro Farma, Bandung | Instalasi Genset 1500 kVA Perkins | 2 units | 2009 |
| | | | |
19 | Sanbe Farma, Bandung | Instalasi Genset 1500 kVA Perkins | 1 unit | 2009 |
| | Instalasi Genset 750 kVA Perkins | 2 units | |
| | | | |
20 | Pembangunan Gedung Telkomsel | Instalasi Genset 650 kVA Catterpilar | 1 unit | 2009 |
| Bandung | | | |
| | | | |
21 | Smart Telekom | | | |
| – Lokasi Semarang | Instalasi Genset 300 kVA Cummins | 1 unit | 2009 |
| – Lokasi Yogyakarta | Instalasi Genset 300 kVA Cummins | 1 unit | |
| | | | |
22 | SGU Serpong | Instalasi Genset 635 kVA Cummins | 2 units | 2009 |
| | | | |
23 | TMC Tasikmalaya | Instalasi Genset 500 kVA Perkins | 3 units | 2009 |
| | | | |
24 | Holiday In | Instalasi Genset 630 kVA Perkins | 1 unit | 2009 |
| | | | |
25 | RS. Tropik Unair Surabaya | Instalasi Genset 1600 kVA Mitsubishi | 2 units | 2009 |
| | | | |
26 | Gedung BRI Ragunan, Jakarta | Instalasi Genset 1700 kVA Perkins | 3 units | 2010 |
| | 2000 kVA Perkins | 1 unit | |
| | | | |
27 | Allianz Tower, Jakarta | Instalasi Genset 1000 kVA Mitsubishi | 3 units | 2010 |
| | | | |
28 | Ratu Plaza, Jakarta | Instalasi Genset 1250 kVA Cummins | 3 units | 2010 |
| | | | |
29 | Exelcomindo Tj. Morawa, Medan | Instalasi Genset 350 kVA Cummins | 1 unit | 2010 |
| | | | |
30 | Tempo Tower, Jakarta | Instalasi Genset 2000 kVA Mitsubishi | 3 units | 2010 |
| | | | |
31 | Balubur Bandung | Instalasi Genset 1000 kVA Perkins | 1 unit | 2010 |
| | | | |
33 | Medion Bandung | Instalasi Genset 1500 kVA Perkins | 2 units | 2010 |
| | | | |
34 | Kuningan City, Jakarta | Instalasi Genset 1800 kVA Mitsubishi | 6 units | 2010 |
| | Instalasi Genset 2000 kVA Mitsubishi | 6 units | |
| | Instalasi Genset 680 kVA Mitsubishi | 1 unit | |
| | | | |
35 | Sanghiang Perkasa, Jakarta | Instalasi Genset 500 kVA Perkins | 1 unit | 2010 |
| | | | |
36 | Energizer, Cimanggis Bogor | Instalasi Genset 1500 kVA Perkins | 1 unit | 2010 |
| | | | |
37 | Gd. Dep. Hukum dan Ham, Jakarta | Instalasi Genset 2000 kVA Mitsubishi | 1 unit | 2010 |
| | | | |
38 | The Residences at Dharmawangsa | Instalasi Genset 2000 kVA Mitsubishi | 1 unit | 2010 |
| Dharmawangsa Apartement Jakarta | Instalasi Genset 1500 kVA Perkins | 1 unit | |
| The Dharmawangsa Hotel | Instalasi Genset 800 kVA Perkins | 2 units | |
| | | | |
| | | | |
39 | Emporium Pluit Mall dan Hotel | Instalasi Genset 2000 kVA Mitsubishi | 2 units | 2011 |
| | | | |
40 | Sinar Mas Land, BSD | Instalasi Genset 750 kVA Cummins | 2 units | 2011 |
| | | | |
41 | Bank Danamon Indonesia, Tugu tani | Instalasi Genset 800 kVA Cummins | 1 unit | 2011 |
| Jakarta | | | |
| | | | |
42 | Wisma Pondok Indah 3 | Instalasi Genset 1500 kVA Cummins | 3 units | 2011 |
| | | | |
43 | Pertamina Geothermal Energy | Instalasi Genset 350 kVA Cummins | 1 unit | 2011 |
| Lahendong | Instalasi Genset 400 kVA Cummins | 1 unit | |
| | | | |
44 | Exelcomindo Palembang | Instalasi Genset 350 kVA Cummins | 1 unit | 2012 |
| | | | |
45 | Medan Center Point | Instalasi Genset 2000 kVA Perkins | 2 units | 2012 |
| | Instalasi Genset 1250 kVA Perkins | 1 unit | |
| Tahap 2 | Instalasi Genset 2000 kVA Perkins | 5 units | |
| | | | |
46 | Danone Dairy Indonesia, Cikarang | Instalasi Genset 2500 kVA Cummins | 1 unit | 2012 |
| | | | |
47 | Best Western Banjarmasin | Instalasi Genset 640 kVA Cummins | 2 units | 2012 |
| | | | |
48 | Saudi Indonesia Multi Invesment | Instalasi Genset 315 kVA Cummins | 1 unit | 2012 |
| Gorontalo | | | |
| | | | |
49 | Bandara Ngurah Rai Bali | Instalasi Genset 1250 kVA Cummins | 2 units | 2012 |
| | | | |
50 | Gedung Indosat Jakarta | Instalasi Genset 2000 kVA Mitsubishi | 2 units | 2012 |
| | | | |
51 | Pondok Indah Street Gallery | Instalasi Genset 2000 kVA Cummins | 2 units | 2012 |
| | | | |
52 | DCI Cibitung MM 2100 | Instalasi Genset 1000 kVA Perkins | 2 units | 2012 |
| | Instalasi Genset 680 kVA Perkins | 1 unit | |
| | | | |
53 | Kariangau, Balikpapan | Instalasi Genset 2500 kVA Perkins | 4 units | 2012 |
| | | | |
54 | Exelcomindo Pekanbaru | Instalasi Genset 1500 kVA Cummins | 3 units | 2013 |
| | | | |
55 | Puri Indah Financial Tower | Instalasi Genset 2000 kVA Cummins | 2 units | 2013 |
| | | | |
56 | Green Bay Hotel | Instalasi Genset 1600 kVA Mitsubishi | 1 unit | 2013 |
| Green Bay Condominium | Instalasi Genset 1600 kVA Mitsubishi | 2 units | |
| Green Bay Mall | Instalasi Genset 2000 kVA Mitsubishi | 2 units | |
| | Instalasi Genset 1000 kVA Mitsubishi | 1 unit | |
| | | | |
57 | Rasuna Tower | Instalasi Genset 2000 kVA Mitsubishi | 6 units | 2013 |
| | | | |
58 | Mekarsari Jonggol Ciuleungsi | Instalasi Genset 300 kVA Cummins | 1 unit | 2013 |
| | | | |
59 | Noble House Kuningan Jakarta | Instalasi Genset 2000 kVA Cummins | 3 units | 2013 |
| | Instalasi Genset 750 kVA Cummins | 1 unit | |
| | | | |
60 | Ferari TB. Simatupang Jakarta | Instalasi Genset 2000 kVA Mitsubishi | 1 unit | 2013 |
| | | | |
61 | II Expo BSD | Instalasi Genset 2000 kVA Cummins | 6 units | 2014 |
| | Instalasi Genset 1250 kVA Cummins | 2 units | |
| | | | |
62 | Apartemen Karawang | Instalasi Genset 400 kVA Perkins | 2 units | 2014 |
| | | | |
63 | Trans Resort Hotel Bali | Instalasi Genset 1825 kVA Caterpillar | 1 unit | 2014 |
| | | | |
64 | PT. Danamon TBK, BSD | Instalasi Genset 1250 kVA Cummins | 1 unit | 2014 |
| | | | |
65 | Gedung Sudarpo Informatika | Instalasi Genset 350 kVA Cummins | 1 unit | 2014 |
| | | | |
66 | Menara Danamon | Instalasi Genset 1500 kVA Mitsubishi | 2 unit | 2014 |
| | | | |
67 | Hotel Holiday Inn Kemayoran | Instalasi Genset 800 kVA Cummins | 2 unit | 2014 |
| | | | |
68 | Paragon Square Tangerang | Instalasi Genset 1400 kVA Mitsubishi | 2 unit | 2014 |
| | Instalasi Genset 800 kVA Mitsubishi | 1 unit | |
| | | | |
69 | Apartemen Madison Park | Instalasi Genset 1250 kVA Perkins | 2 unit | 2014 |
| | | | |
70 | Bandara Ngurah Rai Bali | Instalasi Genset 2750 kVA Cummins | 3 unit | 2014 |
| | | | |
71 | Bank Indonesia – Bandung | Instalasi Genset 640 kVA Cummins | 1 unit | 2014 |
| | | | |
72 | Hall B & C Pekan Raya Jakarta | Instalasi Genset 1500 kVA Cummins | 2 unit | 2015 |
| | | | |
73 | Mall Panakkukang Makasar | Instalasi Genset 2000 kVA Mitsubishi | 1 unit | 2015 |
| | | | |
74 | RS. Pondok Indah | Instalasi Silent Bonnet 1500 kVA Cummins | 1 unit | 2015 |
| | | | |
75 | Astra Honda Motor / AHM Karawang | Instalasi Genset 200 kVA Cummins | 1 unit | 2015 |
| | | | |
76 | PT. Indofood CBP Sukses Mandiri Makmur | Instalasi Genset 1000 kVA Cummins | 1 unit | 2015 |
| | | | |
77 | RSPI Bintaro | Instalasi Genset 1450 kVA Mitsubishi | 2 unit | 2016 |
| | | | |
78 | PT. Indofood Sukses Makmur Bogasari | Instalasi Genset 400 kVA Cummins | 1 unit | 2016 |
| | | | |
79 | Distric 8 Area Apartemen 3 & Office | Instalasi Silent Bonnet 2015 kVA Mitsubishi | 5 unit | 2016 |
| | Instalasi Genset 2250 kVA Mitsubishi | 5 unit | |
| Distric 8 Area Apartemen 3 & Mall | Instalasi Genset 2015 kVA Mitsubishi | 4 unit | |
| | | | |
80 | Gedung KPK Tahap II | Instalasi Genset 2000 kVA Perkins | 2 unit | 2016 |
| | | | |
81 | Podomoro City Deli Medan | | | |
| Area Hotel & Ballroom | Instalasi Genset 885 kVA Mitsubishi | 1 unit | 2016 |
| Area Office Tower | Instalasi Genset 2015 kVA Mitsubishi | 3 unit | |
| Area Tribeca Northern & Southern | Instalasi Genset 1450 kVA Mitsubishi | 2 unit | |
| Area Tower Liberty, Lincoln & Lexington | Instalasi Genset 1450 kVA Mitsubishi | 3 unit | |
| Area Tower Empire & Victory | Instalasi Genset 1450 kVA Mitsubishi | 2 unit | |
| Area Mall | Instalasi Genset 2015 kVA Mitsubishi | 9 unit | |
| | | | |
82 | Unilever Indonesia – BSD Tangerang | Instalasi Genset 1250 kVA Cummins | 3 unit | 2016 |
| | Instalasi Genset 500 kVA Cummins | 1 unit | |
| | | | |
83 | Menara Astra | Instalasi Genset 2000 kVA Perkins | 5 unit | 2016 |
| | | | |
84 | Pondok Indah Residence (PIR) | Instalasi Genset 2000 kVA Cummins | 3 unit | 2016 |
| | | | |
85 | Pondok Indah Hotel (PIH) | Instalasi Genset 1500 kVA Cummins | 4 unit | 2016 |
| | | | |
86 | Sinar Mas Data Centre | Instalasi Genset 640 kVA Cummins | 1 unit | 2016 |
| | | | |
87 | Hall B & C Pekan Raya Jakarta – Extension | Instalasi Genset 1500 kVA Cummins | 1 unit | 2016 |
| | | | |
88 | RSPI Bintaro | Instalasi Genset 1450 kVA Mitsubishi | 2 unit | 2016 |
| | | | |
89 | Pakubuwono Spring | Instalasi Genset 1362 kVA Mitsubishi | 3 unit | 2016 |
| | | | |
90 | World Capital Tower | Instalasi Genset 2000 kVA Mitsubishi | 4 unit | 2017 |
| | | | |
91 | Nipah Mall Makassar | Instalasi Genset 2000 kVA Mitsubishi | 5 unit | 2017 |
| | | | |
92 | Taman Anggrek Residence | Instalasi Genset 2000 kVA Mitsubishi | 5 unit | 2017 |
| | | | |
93 | Danone Aqua- Solok | Instalasi Genset 750 kVA Perkins | 1 unit | 2017 |
| | | | |
94 | RS. Intan Medika- Pangkal Pinang | Instalasi Genset 1000 kVA Cummins Baifa | 1 unit | 2017 |
| | | | |
95 | Borneo Bay Apartemen – Balikpapan | Instalasi Genset 1450 kVA Mitsubishi | 2 unit | 2017 |
| | | | |
96 | Borneo Bay Mall – Balikpapan | Instalasi Genset 2015 kVA Mitsubishi | 5 unit | 2017 |
| | | | |
97 | Langham District 8 | Instalasi Genset 1800 kVA Mitsubishi | 2 unit | 2017 |
| | | | |
98 | PT. Mas Sumbiri – Semarang | Instalasi Genset 1000 kVA Cummins | 1 unit | 2017 |
| | | | |
99 | PT. Prym Intimates Indonesia – Semarang | Instalasi Genset 825 kVA Cummins | 1 unit | 2017 |
| | | | |
100 | Grand Indonesia Phase 1 | Instalasi Genset 2000 kVA Mitsubishi | 1 unit | 2017 |
| | | | |
101 | Proyek JI Expo Theater & Convenstion Center | Instalasi Genset 2000 kVA Cummins | 2 unit | 2017 |
| | Instalasi Genset 1250 kVA Cummins | 1 unit | 2017 |
| | | | |
101 | Proyek MNC | Instalasi Genset 1500 kVA Cummins | 1 unit | 2018 |
| | | | |
102 | Proyek Sima Office Tower | Instalasi Genset 2000 kVA Mitsubishi | 3 unit | 2018 |
| | | | |
103 | Proyek MNC Sky Vision | Instalasi Genset 1500 kVA Cummins | 1 unit | 2018 |
| | | | |
104 | Proyek Southgate Office Tower | Instalasi Genset 2015 kVA Mitsubishi | 4 unit | 2018 |
| | Instalasi Genset 1360 kVA Mitsubishi | 1 unit | 2018 |
| | Instalasi Genset 1000 kVA Mitsubishi | 2 unit | 2018 |
| | Instalasi Genset 690 kVA Mitsubishi | 1 unit | 2018 |
| | | | |
105 | AHM Dawuan Karawang | Instalasi Genset 20000 kVA Cummins | 1 unit | 2018 |
| | | | |
106 | Grand Indonesia Phase 2 | Instalasi Genset 2000 kVA Mitsubishi | 2 unit | 2018 |
| | | | |
107 | Grand Indonesia Phase 3 | Instalasi Genset 2000 kVA Mitsubishi | 2 unit | 2018 |
| | | | |
108 | RSKO Cibubur | Instalasi Genset 500 kVA Cummins | 1 unit | 2018 |
| | | | |
109 | Bandung International Convention Center | Instalasi Genset 2000 kVA Mitsubishi | 4 unit | 2018 |
| | | | |
110 | Chitaland Tower | Instalasi Genset 2000 kVA Caterpillar | 4 unit | 2018 |
| | | | |
111 | Gemala Kempa Daya | Instalasi Genset 1250 kVA | 1 unit | 2018 |
| | | | |
112 | Indonesia One | Instalasi Silent Bonnet 2000 kVA Mitsubishi | 8 unit | 2018 |
| | | | |
113 | Grand Indonesia Phase 4 | Instalasi Genset 2000 kVA Mitsubishi | 2 unit | 2019 |
| | | | |
114 | Daswin Tower | Instalasi Silent Bonnet 2000 kVA | 3 unit | 2019 |
| | | | |
115 | Pakubuwono Menteng | Instalasi Genset 1450 kVA | 2 Unit | 2019 |
| | | | |
116 | Danayasa Control Building | Instalasi Genset 1000 kVA | 2 Unit | 2019 |
| | | | |
| | | | |
117 | Hunstman | Instalasi Genset 750 kVA | 1 Unit | 2019 |
| | Unistall Genset 250 kVA | 4 Unit | 2019 |
| | | | |
118 | Mas Silueta Semarang | Instalasi Genset 1500 kVA | 1 Unit | 2020 |
| | | | |
119 | Sespim Polri | Instalasi Genset 320 kVA | 1 Unit | 2020 |
| | | | |
120 | Transpark Cibubur APT | Instalasi Genset 1800 kVA | 2 Unit | 2020 |
| | | | |
121 | BT COCOA | Instalasi Genset 2000 KVA | 3 Unit | 2020 |
| | | | |
122 | Smart KCP Badau – KALUT | Instalasi Genset 1000 KVA | 1 Unit | 2020 |
| | | | |
123 | Sayana APT | Instalasi Genset 1 x 400 KVA | 1 Unit | 2021 |
| | | | |
124 | Thamrine Residences | Instalasi Genset 1 x 1800 KVA | 1 Unit | 2021 |
| | | | |
125 | Transpark Cibubur MALL | Penyesuaian Ruang Genset ke System Build In Radiator | 6 Unit | 2021 |
| | | | |
126 | DCI – Princenton Digital Group, Cibitung | Instalasi Genset | 2 Unit | 2021 |
| | | | |
127 | DCI – OCBC NISP | Instalasi Genset | 2 Unit | 2021 |
| | | | |
128 | Kingland | Instalasi Genset | 2 Unit | 2021 |
| | | | |
129 | Mandiri Rempoa | Instalasi Genset | 2 Unit | 2021 |
| | | | |
130 | Rusun Pulo Jahe | Instalasi Genset | 2 Unit | 2021 |
| | | | |
131 | DTP – Cimanggis | Instalasi Genset | 2 Unit | 2021 |