| NO. |
PROJECT NAME |
DESCRIPTION |
QTY |
YEAR |
|
|
|
|
|
| 1 |
Mall Balikpapan Kalimantan |
Instalasi Genset 1000 kVA |
2 units |
2006 |
|
|
|
|
|
| 2 |
Carrefour Duta Merlin Jakarta |
Instalasi Genset 1250 kVA |
1 unit |
2006 |
|
|
|
|
|
| 3 |
Matahari Malang Town Square |
Instalasi Genset 840 kVA |
2 units |
2006 |
|
|
|
|
|
| 4 |
Pharmasi Binangkit / Pabrik Pacecap |
Instalasi Genset 350 kVA |
1 unit |
2006 |
|
Majalengka |
|
|
|
|
|
|
|
|
| 5 |
RS. Meilia Cibubur |
Instalasi Silent Bonnet 1000 kVA |
2 units |
2006 |
|
|
|
|
|
| 6 |
FO. Heritage Bandung |
Instalasi Genset 720 kVA |
1 unit |
2007 |
|
|
|
|
|
| 7 |
Apartement Casablanca Mansion |
Instalasi Genset 500 kVA |
1 unit |
2007 |
|
|
Instalasi Genset 720 kVA |
1 unit |
|
|
|
|
|
|
| 8 |
Matahari Cibubur Town Square |
Instalasi Genset 840 kVA |
2 units |
2007 |
|
|
|
|
|
| 9 |
Mall Panakkukang Makasar |
Instalasi Genset 2000 kVA |
3 units |
2007 |
|
|
|
|
|
| 10 |
RS. Sentosa Internasional (RSSI) |
Instalasi Genset 2000 kVA |
2 units |
2007 |
|
Bandung |
|
|
|
|
|
|
|
|
| 11 |
BG Junction Surabaya |
Instalasi Genset 2000 kVA |
5 units |
2008 |
|
|
|
|
|
| 12 |
Matahari Depok Town Square |
Instalasi Genset 840 kVA |
2 units |
2008 |
|
|
|
|
|
| 13 |
Matahari Grand Palladium Medan |
Instalasi Genset 840 kVA |
2 units |
2008 |
|
|
|
|
|
| 14 |
Depok Town Center |
Instalasi Genset 500 kVA |
2 units |
2008 |
|
|
|
|
|
| 15 |
The Grove Apartment & Wall |
Instalasi Genset 2000 kVA Mitsubishi |
5 units |
2008 |
|
|
|
|
|
| 16 |
Bakrie Tower |
Instalasi Genset 2000 kVA Mitsubishi |
5 units |
2008 |
|
|
|
|
|
| 17 |
Grand City Surabaya |
Instalasi Genset 2000 kVA Cummins |
5 units |
2008 |
|
|
|
|
|
| 18 |
Mepro Farma, Bandung |
Instalasi Genset 1500 kVA Perkins |
2 units |
2009 |
|
|
|
|
|
| 19 |
Sanbe Farma, Bandung |
Instalasi Genset 1500 kVA Perkins |
1 unit |
2009 |
|
|
Instalasi Genset 750 kVA Perkins |
2 units |
|
|
|
|
|
|
| 20 |
Pembangunan Gedung Telkomsel |
Instalasi Genset 650 kVA Catterpilar |
1 unit |
2009 |
|
Bandung |
|
|
|
|
|
|
|
|
| 21 |
Smart Telekom |
|
|
|
|
– Lokasi Semarang |
Instalasi Genset 300 kVA Cummins |
1 unit |
2009 |
|
– Lokasi Yogyakarta |
Instalasi Genset 300 kVA Cummins |
1 unit |
|
|
|
|
|
|
| 22 |
SGU Serpong |
Instalasi Genset 635 kVA Cummins |
2 units |
2009 |
|
|
|
|
|
| 23 |
TMC Tasikmalaya |
Instalasi Genset 500 kVA Perkins |
3 units |
2009 |
|
|
|
|
|
| 24 |
Holiday In |
Instalasi Genset 630 kVA Perkins |
1 unit |
2009 |
|
|
|
|
|
| 25 |
RS. Tropik Unair Surabaya |
Instalasi Genset 1600 kVA Mitsubishi |
2 units |
2009 |
|
|
|
|
|
| 26 |
Gedung BRI Ragunan, Jakarta |
Instalasi Genset 1700 kVA Perkins |
3 units |
2010 |
|
|
2000 kVA Perkins |
1 unit |
|
|
|
|
|
|
| 27 |
Allianz Tower, Jakarta |
Instalasi Genset 1000 kVA Mitsubishi |
3 units |
2010 |
|
|
|
|
|
| 28 |
Ratu Plaza, Jakarta |
Instalasi Genset 1250 kVA Cummins |
3 units |
2010 |
|
|
|
|
|
| 29 |
Exelcomindo Tj. Morawa, Medan |
Instalasi Genset 350 kVA Cummins |
1 unit |
2010 |
|
|
|
|
|
| 30 |
Tempo Tower, Jakarta |
Instalasi Genset 2000 kVA Mitsubishi |
3 units |
2010 |
|
|
|
|
|
| 31 |
Balubur Bandung |
Instalasi Genset 1000 kVA Perkins |
1 unit |
2010 |
|
|
|
|
|
| 33 |
Medion Bandung |
Instalasi Genset 1500 kVA Perkins |
2 units |
2010 |
|
|
|
|
|
| 34 |
Kuningan City, Jakarta |
Instalasi Genset 1800 kVA Mitsubishi |
6 units |
2010 |
|
|
Instalasi Genset 2000 kVA Mitsubishi |
6 units |
|
|
|
Instalasi Genset 680 kVA Mitsubishi |
1 unit |
|
|
|
|
|
|
| 35 |
Sanghiang Perkasa, Jakarta |
Instalasi Genset 500 kVA Perkins |
1 unit |
2010 |
|
|
|
|
|
| 36 |
Energizer, Cimanggis Bogor |
Instalasi Genset 1500 kVA Perkins |
1 unit |
2010 |
|
|
|
|
|
| 37 |
Gd. Dep. Hukum dan Ham, Jakarta |
Instalasi Genset 2000 kVA Mitsubishi |
1 unit |
2010 |
|
|
|
|
|
| 38 |
The Residences at Dharmawangsa |
Instalasi Genset 2000 kVA Mitsubishi |
1 unit |
2010 |
|
Dharmawangsa Apartement Jakarta |
Instalasi Genset 1500 kVA Perkins |
1 unit |
|
|
The Dharmawangsa Hotel |
Instalasi Genset 800 kVA Perkins |
2 units |
|
|
|
|
|
|
|
|
|
|
|
| 39 |
Emporium Pluit Mall dan Hotel |
Instalasi Genset 2000 kVA Mitsubishi |
2 units |
2011 |
|
|
|
|
|
| 40 |
Sinar Mas Land, BSD |
Instalasi Genset 750 kVA Cummins |
2 units |
2011 |
|
|
|
|
|
| 41 |
Bank Danamon Indonesia, Tugu tani |
Instalasi Genset 800 kVA Cummins |
1 unit |
2011 |
|
Jakarta |
|
|
|
|
|
|
|
|
| 42 |
Wisma Pondok Indah 3 |
Instalasi Genset 1500 kVA Cummins |
3 units |
2011 |
|
|
|
|
|
| 43 |
Pertamina Geothermal Energy |
Instalasi Genset 350 kVA Cummins |
1 unit |
2011 |
|
Lahendong |
Instalasi Genset 400 kVA Cummins |
1 unit |
|
|
|
|
|
|
| 44 |
Exelcomindo Palembang |
Instalasi Genset 350 kVA Cummins |
1 unit |
2012 |
|
|
|
|
|
| 45 |
Medan Center Point |
Instalasi Genset 2000 kVA Perkins |
2 units |
2012 |
|
|
Instalasi Genset 1250 kVA Perkins |
1 unit |
|
|
Tahap 2 |
Instalasi Genset 2000 kVA Perkins |
5 units |
|
|
|
|
|
|
| 46 |
Danone Dairy Indonesia, Cikarang |
Instalasi Genset 2500 kVA Cummins |
1 unit |
2012 |
|
|
|
|
|
| 47 |
Best Western Banjarmasin |
Instalasi Genset 640 kVA Cummins |
2 units |
2012 |
|
|
|
|
|
| 48 |
Saudi Indonesia Multi Invesment |
Instalasi Genset 315 kVA Cummins |
1 unit |
2012 |
|
Gorontalo |
|
|
|
|
|
|
|
|
| 49 |
Bandara Ngurah Rai Bali |
Instalasi Genset 1250 kVA Cummins |
2 units |
2012 |
|
|
|
|
|
| 50 |
Gedung Indosat Jakarta |
Instalasi Genset 2000 kVA Mitsubishi |
2 units |
2012 |
|
|
|
|
|
| 51 |
Pondok Indah Street Gallery |
Instalasi Genset 2000 kVA Cummins |
2 units |
2012 |
|
|
|
|
|
| 52 |
DCI Cibitung MM 2100 |
Instalasi Genset 1000 kVA Perkins |
2 units |
2012 |
|
|
Instalasi Genset 680 kVA Perkins |
1 unit |
|
|
|
|
|
|
| 53 |
Kariangau, Balikpapan |
Instalasi Genset 2500 kVA Perkins |
4 units |
2012 |
|
|
|
|
|
| 54 |
Exelcomindo Pekanbaru |
Instalasi Genset 1500 kVA Cummins |
3 units |
2013 |
|
|
|
|
|
| 55 |
Puri Indah Financial Tower |
Instalasi Genset 2000 kVA Cummins |
2 units |
2013 |
|
|
|
|
|
| 56 |
Green Bay Hotel |
Instalasi Genset 1600 kVA Mitsubishi |
1 unit |
2013 |
|
Green Bay Condominium |
Instalasi Genset 1600 kVA Mitsubishi |
2 units |
|
|
Green Bay Mall |
Instalasi Genset 2000 kVA Mitsubishi |
2 units |
|
|
|
Instalasi Genset 1000 kVA Mitsubishi |
1 unit |
|
|
|
|
|
|
| 57 |
Rasuna Tower |
Instalasi Genset 2000 kVA Mitsubishi |
6 units |
2013 |
|
|
|
|
|
| 58 |
Mekarsari Jonggol Ciuleungsi |
Instalasi Genset 300 kVA Cummins |
1 unit |
2013 |
|
|
|
|
|
| 59 |
Noble House Kuningan Jakarta |
Instalasi Genset 2000 kVA Cummins |
3 units |
2013 |
|
|
Instalasi Genset 750 kVA Cummins |
1 unit |
|
|
|
|
|
|
| 60 |
Ferari TB. Simatupang Jakarta |
Instalasi Genset 2000 kVA Mitsubishi |
1 unit |
2013 |
|
|
|
|
|
| 61 |
II Expo BSD |
Instalasi Genset 2000 kVA Cummins |
6 units |
2014 |
|
|
Instalasi Genset 1250 kVA Cummins |
2 units |
|
|
|
|
|
|
| 62 |
Apartemen Karawang |
Instalasi Genset 400 kVA Perkins |
2 units |
2014 |
|
|
|
|
|
| 63 |
Trans Resort Hotel Bali |
Instalasi Genset 1825 kVA Caterpillar |
1 unit |
2014 |
|
|
|
|
|
| 64 |
PT. Danamon TBK, BSD |
Instalasi Genset 1250 kVA Cummins |
1 unit |
2014 |
|
|
|
|
|
| 65 |
Gedung Sudarpo Informatika |
Instalasi Genset 350 kVA Cummins |
1 unit |
2014 |
|
|
|
|
|
| 66 |
Menara Danamon |
Instalasi Genset 1500 kVA Mitsubishi |
2 unit |
2014 |
|
|
|
|
|
| 67 |
Hotel Holiday Inn Kemayoran |
Instalasi Genset 800 kVA Cummins |
2 unit |
2014 |
|
|
|
|
|
| 68 |
Paragon Square Tangerang |
Instalasi Genset 1400 kVA Mitsubishi |
2 unit |
2014 |
|
|
Instalasi Genset 800 kVA Mitsubishi |
1 unit |
|
|
|
|
|
|
| 69 |
Apartemen Madison Park |
Instalasi Genset 1250 kVA Perkins |
2 unit |
2014 |
|
|
|
|
|
| 70 |
Bandara Ngurah Rai Bali |
Instalasi Genset 2750 kVA Cummins |
3 unit |
2014 |
|
|
|
|
|
| 71 |
Bank Indonesia – Bandung |
Instalasi Genset 640 kVA Cummins |
1 unit |
2014 |
|
|
|
|
|
| 72 |
Hall B & C Pekan Raya Jakarta |
Instalasi Genset 1500 kVA Cummins |
2 unit |
2015 |
|
|
|
|
|
| 73 |
Mall Panakkukang Makasar |
Instalasi Genset 2000 kVA Mitsubishi |
1 unit |
2015 |
|
|
|
|
|
| 74 |
RS. Pondok Indah |
Instalasi Silent Bonnet 1500 kVA Cummins |
1 unit |
2015 |
|
|
|
|
|
| 75 |
Astra Honda Motor / AHM Karawang |
Instalasi Genset 200 kVA Cummins |
1 unit |
2015 |
|
|
|
|
|
| 76 |
PT. Indofood CBP Sukses Mandiri Makmur |
Instalasi Genset 1000 kVA Cummins |
1 unit |
2015 |
|
|
|
|
|
| 77 |
RSPI Bintaro |
Instalasi Genset 1450 kVA Mitsubishi |
2 unit |
2016 |
|
|
|
|
|
| 78 |
PT. Indofood Sukses Makmur Bogasari |
Instalasi Genset 400 kVA Cummins |
1 unit |
2016 |
|
|
|
|
|
| 79 |
Distric 8 Area Apartemen 3 & Office |
Instalasi Silent Bonnet 2015 kVA Mitsubishi |
5 unit |
2016 |
|
|
Instalasi Genset 2250 kVA Mitsubishi |
5 unit |
|
|
Distric 8 Area Apartemen 3 & Mall |
Instalasi Genset 2015 kVA Mitsubishi |
4 unit |
|
|
|
|
|
|
| 80 |
Gedung KPK Tahap II |
Instalasi Genset 2000 kVA Perkins |
2 unit |
2016 |
|
|
|
|
|
| 81 |
Podomoro City Deli Medan |
|
|
|
|
Area Hotel & Ballroom |
Instalasi Genset 885 kVA Mitsubishi |
1 unit |
2016 |
|
Area Office Tower |
Instalasi Genset 2015 kVA Mitsubishi |
3 unit |
|
|
Area Tribeca Northern & Southern |
Instalasi Genset 1450 kVA Mitsubishi |
2 unit |
|
|
Area Tower Liberty, Lincoln & Lexington |
Instalasi Genset 1450 kVA Mitsubishi |
3 unit |
|
|
Area Tower Empire & Victory |
Instalasi Genset 1450 kVA Mitsubishi |
2 unit |
|
|
Area Mall |
Instalasi Genset 2015 kVA Mitsubishi |
9 unit |
|
|
|
|
|
|
| 82 |
Unilever Indonesia – BSD Tangerang |
Instalasi Genset 1250 kVA Cummins |
3 unit |
2016 |
|
|
Instalasi Genset 500 kVA Cummins |
1 unit |
|
|
|
|
|
|
| 83 |
Menara Astra |
Instalasi Genset 2000 kVA Perkins |
5 unit |
2016 |
|
|
|
|
|
| 84 |
Pondok Indah Residence (PIR) |
Instalasi Genset 2000 kVA Cummins |
3 unit |
2016 |
|
|
|
|
|
| 85 |
Pondok Indah Hotel (PIH) |
Instalasi Genset 1500 kVA Cummins |
4 unit |
2016 |
|
|
|
|
|
| 86 |
Sinar Mas Data Centre |
Instalasi Genset 640 kVA Cummins |
1 unit |
2016 |
|
|
|
|
|
| 87 |
Hall B & C Pekan Raya Jakarta – Extension |
Instalasi Genset 1500 kVA Cummins |
1 unit |
2016 |
|
|
|
|
|
| 88 |
RSPI Bintaro |
Instalasi Genset 1450 kVA Mitsubishi |
2 unit |
2016 |
|
|
|
|
|
| 89 |
Pakubuwono Spring |
Instalasi Genset 1362 kVA Mitsubishi |
3 unit |
2016 |
|
|
|
|
|
| 90 |
World Capital Tower |
Instalasi Genset 2000 kVA Mitsubishi |
4 unit |
2017 |
|
|
|
|
|
| 91 |
Nipah Mall Makassar |
Instalasi Genset 2000 kVA Mitsubishi |
5 unit |
2017 |
|
|
|
|
|
| 92 |
Taman Anggrek Residence |
Instalasi Genset 2000 kVA Mitsubishi |
5 unit |
2017 |
|
|
|
|
|
| 93 |
Danone Aqua- Solok |
Instalasi Genset 750 kVA Perkins |
1 unit |
2017 |
|
|
|
|
|
| 94 |
RS. Intan Medika- Pangkal Pinang |
Instalasi Genset 1000 kVA Cummins Baifa |
1 unit |
2017 |
|
|
|
|
|
| 95 |
Borneo Bay Apartemen – Balikpapan |
Instalasi Genset 1450 kVA Mitsubishi |
2 unit |
2017 |
|
|
|
|
|
| 96 |
Borneo Bay Mall – Balikpapan |
Instalasi Genset 2015 kVA Mitsubishi |
5 unit |
2017 |
|
|
|
|
|
| 97 |
Langham District 8 |
Instalasi Genset 1800 kVA Mitsubishi |
2 unit |
2017 |
|
|
|
|
|
| 98 |
PT. Mas Sumbiri – Semarang |
Instalasi Genset 1000 kVA Cummins |
1 unit |
2017 |
|
|
|
|
|
| 99 |
PT. Prym Intimates Indonesia – Semarang |
Instalasi Genset 825 kVA Cummins |
1 unit |
2017 |
|
|
|
|
|
| 100 |
Grand Indonesia Phase 1 |
Instalasi Genset 2000 kVA Mitsubishi |
1 unit |
2017 |
|
|
|
|
|
| 101 |
Proyek JI Expo Theater & Convenstion Center |
Instalasi Genset 2000 kVA Cummins |
2 unit |
2017 |
|
|
Instalasi Genset 1250 kVA Cummins |
1 unit |
2017 |
|
|
|
|
|
| 101 |
Proyek MNC |
Instalasi Genset 1500 kVA Cummins |
1 unit |
2018 |
|
|
|
|
|
| 102 |
Proyek Sima Office Tower |
Instalasi Genset 2000 kVA Mitsubishi |
3 unit |
2018 |
|
|
|
|
|
| 103 |
Proyek MNC Sky Vision |
Instalasi Genset 1500 kVA Cummins |
1 unit |
2018 |
|
|
|
|
|
| 104 |
Proyek Southgate Office Tower |
Instalasi Genset 2015 kVA Mitsubishi |
4 unit |
2018 |
|
|
Instalasi Genset 1360 kVA Mitsubishi |
1 unit |
2018 |
|
|
Instalasi Genset 1000 kVA Mitsubishi |
2 unit |
2018 |
|
|
Instalasi Genset 690 kVA Mitsubishi |
1 unit |
2018 |
|
|
|
|
|
| 105 |
AHM Dawuan Karawang |
Instalasi Genset 20000 kVA Cummins |
1 unit |
2018 |
|
|
|
|
|
| 106 |
Grand Indonesia Phase 2 |
Instalasi Genset 2000 kVA Mitsubishi |
2 unit |
2018 |
|
|
|
|
|
| 107 |
Grand Indonesia Phase 3 |
Instalasi Genset 2000 kVA Mitsubishi |
2 unit |
2018 |
|
|
|
|
|
| 108 |
RSKO Cibubur |
Instalasi Genset 500 kVA Cummins |
1 unit |
2018 |
|
|
|
|
|
| 109 |
Bandung International Convention Center |
Instalasi Genset 2000 kVA Mitsubishi |
4 unit |
2018 |
|
|
|
|
|
| 110 |
Chitaland Tower |
Instalasi Genset 2000 kVA Caterpillar |
4 unit |
2018 |
|
|
|
|
|
| 111 |
Gemala Kempa Daya |
Instalasi Genset 1250 kVA |
1 unit |
2018 |
|
|
|
|
|
| 112 |
Indonesia One |
Instalasi Silent Bonnet 2000 kVA Mitsubishi |
8 unit |
2018 |
|
|
|
|
|
| 113 |
Grand Indonesia Phase 4 |
Instalasi Genset 2000 kVA Mitsubishi |
2 unit |
2019 |
|
|
|
|
|
| 114 |
Daswin Tower |
Instalasi Silent Bonnet 2000 kVA |
3 unit |
2019 |
|
|
|
|
|
| 115 |
Pakubuwono Menteng |
Instalasi Genset 1450 kVA |
2 Unit |
2019 |
|
|
|
|
|
| 116 |
Danayasa Control Building |
Instalasi Genset 1000 kVA |
2 Unit |
2019 |
|
|
|
|
|
|
|
|
|
|
| 117 |
Hunstman |
Instalasi Genset 750 kVA |
1 Unit |
2019 |
|
|
Unistall Genset 250 kVA |
4 Unit |
2019 |
|
|
|
|
|
| 118 |
Mas Silueta Semarang |
Instalasi Genset 1500 kVA |
1 Unit |
2020 |
|
|
|
|
|
| 119 |
Sespim Polri |
Instalasi Genset 320 kVA |
1 Unit |
2020 |
|
|
|
|
|
| 120 |
Transpark Cibubur APT |
Instalasi Genset 1800 kVA |
2 Unit |
2020 |
|
|
|
|
|
| 121 |
BT COCOA |
Instalasi Genset 2000 KVA |
3 Unit |
2020 |
|
|
|
|
|
| 122 |
Smart KCP Badau – KALUT |
Instalasi Genset 1000 KVA |
1 Unit |
2020 |
|
|
|
|
|
| 123 |
Sayana APT |
Instalasi Genset 1 x 400 KVA |
1 Unit |
2021 |
|
|
|
|
|
| 124 |
Thamrine Residences |
Instalasi Genset 1 x 1800 KVA |
1 Unit |
2021 |
|
|
|
|
|
| 125 |
Transpark Cibubur MALL |
Penyesuaian Ruang Genset ke System Build In Radiator |
6 Unit |
2021 |
|
|
|
|
|
| 126 |
DCI – Princenton Digital Group, Cibitung |
Instalasi Genset |
2 Unit |
2021 |
|
|
|
|
|
| 127 |
DCI – OCBC NISP |
Instalasi Genset |
2 Unit |
2021 |
|
|
|
|
|
| 128 |
Kingland |
Instalasi Genset |
2 Unit |
2021 |
|
|
|
|
|
| 129 |
Mandiri Rempoa |
Instalasi Genset |
2 Unit |
2021 |
|
|
|
|
|
| 130 |
Rusun Pulo Jahe |
Instalasi Genset |
2 Unit |
2021 |
|
|
|
|
|
| 131 |
DTP – Cimanggis |
Instalasi Genset |
2 Unit |
2021 |